{"id":20975,"date":"2025-03-06T14:53:08","date_gmt":"2025-03-06T11:53:08","guid":{"rendered":"https:\/\/bimsolutions.ge\/eng\/?p=20975"},"modified":"2025-03-06T14:53:45","modified_gmt":"2025-03-06T11:53:45","slug":"steel-canopy-structure-of-opportunity-pavilion","status":"publish","type":"post","link":"https:\/\/bimsolutions.ge\/eng\/blog\/steel-canopy-structure-of-opportunity-pavilion\/","title":{"rendered":"Steel canopy structure of Opportunity Pavilion"},"content":{"rendered":"<div class=\"article-content-perex perex mb-30\">The Opportunity Pavilion stands as a testament to cutting-edge engineering and rapid construction, located at one of the three main entrances of Expo 2020 Dubai in the United Arab Emirates. The unique steel structure was designed to be built around a spacious, covered plaza as one of the main entrances of Opportunity District.<\/div>\n<div class=\"article-content-main math-container\">\n<h2>About the project<\/h2>\n<p>The\u00a0Opportunity Pavilion\u00a0was designed by AGi Architects for Expo 2020\u00a0in Dubai. The structure was conceived as a large plaza, providing continuity to the Opportunity District in which it is situated. The goal of the Opportunity Pavilion was\u00a0to create an engaging, inspiring environment that underscores Expo 2020&#8217;s commitment to promoting better access to essential resources and\u00a0achieving the UN\u2019s Sustainable Development Goals.<\/p>\n<p>Eversendai&#8217;s engineers played a key role in the project, focusing specifically on the canopy steelwork design. The canopy floating 32 meters above the ground represents clouds symbolizing\u00a0dreams that\u00a0people aspire to achieve.\u00a0The plaza is placed on two levels, bridging the terrain&#8217;s slope. The canopy is composed of six steel overlapping layers, transforming with respect to the time of day and light.<\/p>\n<div class=\"\">\n<div class=\"pux-container\">\n<div class=\"small-container\">\n<div class=\"gallery-container lines gallery-perex\" data-slides=\"3\">\n<div class=\"gallery-box\">\n<div class=\"gallery-item-image\"><picture><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/b23eec7c-55b5-4ba7-ae64-7c78adf4ac04\/Opportunity%20Pavilion1.png?w=400\" \/><img decoding=\"async\" src=\"https:\/\/assets-us-01.kc-usercontent.com\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/b23eec7c-55b5-4ba7-ae64-7c78adf4ac04\/Opportunity%20Pavilion1.png?w=400\" alt=\"gallery item image\" \/><\/picture><\/div>\n<\/div>\n<div class=\"gallery-box\">\n<div class=\"gallery-item-image\"><picture><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/9f860541-b812-4b46-ab95-14b013d9493c\/Opportunity%20Pavilion2.png?w=400\" \/><img decoding=\"async\" src=\"https:\/\/assets-us-01.kc-usercontent.com\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/9f860541-b812-4b46-ab95-14b013d9493c\/Opportunity%20Pavilion2.png?w=400\" alt=\"gallery item image\" \/><\/picture><\/div>\n<\/div>\n<div class=\"gallery-box\">\n<div class=\"gallery-item-image\"><picture><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/8f726e7c-49ce-4ad2-9a63-8f79aa17bd27\/Opportunity%20Pavilion3.png?w=400\" \/><img decoding=\"async\" src=\"https:\/\/assets-us-01.kc-usercontent.com\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/8f726e7c-49ce-4ad2-9a63-8f79aa17bd27\/Opportunity%20Pavilion3.png?w=400\" alt=\"gallery item image\" \/><\/picture><\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<h2>Engineering Challenges<\/h2>\n<p>The Opportunity Pavilion&#8217;s design was a giant challenge by itself due to its architectural requirements. Multiple truss systems intertwined across various layers, forming an intricate 3D structure with extensive cantilevers that span over 40 meters. Everything is supported by a few columns.<\/p>\n<div><a href=\"https:\/\/assets-us-01.kc-usercontent.com\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/af52070c-2a89-4349-821f-e430ed3c3756\/Steel%20structure.png\" data-fancybox=\"inline-image\"><picture><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/af52070c-2a89-4349-821f-e430ed3c3756\/Steel%20structure.png\" media=\"(min-width:768px)\" \/><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/af52070c-2a89-4349-821f-e430ed3c3756\/Steel%20structure.png?w=768\" media=\"(min-width:650px)\" \/><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/af52070c-2a89-4349-821f-e430ed3c3756\/Steel%20structure.png?w=650\" media=\"(min-width:465px)\" \/><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/af52070c-2a89-4349-821f-e430ed3c3756\/Steel%20structure.png?w=465\" media=\"(max-width:464px)\" \/><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter\" src=\"https:\/\/assets-us-01.kc-usercontent.com\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/af52070c-2a89-4349-821f-e430ed3c3756\/Steel%20structure.png\" alt=\"inline image in article\" width=\"1072\" height=\"563\" \/><\/picture><\/a><\/div>\n<p>The project required Opportunity Pavilion to be completed\u00a0within four months, including detailed design, procurement, interface coordination, fabrication, and construction. Only one month was dedicated to managing the complex structural design, including verification of more than 1,600 unique connection types. All joints are really complex, with around 10 members meeting in various angles at one point. Joints comprised of 18 members were no exception. Each node demanded code-checking and optimization\u00a0to ensure material efficiency without compromising structural integrity. As the structure was not permanent and was disassembled, the design emphasized the use of very thin profiles to minimize material consumption.<\/p>\n<div><a href=\"https:\/\/assets-us-01.kc-usercontent.com\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/9461e9bd-500b-4499-bec4-b2a3212f6d9d\/Gif%20-%20rotation.gif\" data-fancybox=\"inline-image\"><picture><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/9461e9bd-500b-4499-bec4-b2a3212f6d9d\/Gif%20-%20rotation.gif\" media=\"(min-width:768px)\" \/><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/9461e9bd-500b-4499-bec4-b2a3212f6d9d\/Gif%20-%20rotation.gif?w=768\" media=\"(min-width:650px)\" \/><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/9461e9bd-500b-4499-bec4-b2a3212f6d9d\/Gif%20-%20rotation.gif?w=650\" media=\"(min-width:465px)\" \/><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/9461e9bd-500b-4499-bec4-b2a3212f6d9d\/Gif%20-%20rotation.gif?w=465\" media=\"(max-width:464px)\" \/><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter\" src=\"https:\/\/assets-us-01.kc-usercontent.com\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/9461e9bd-500b-4499-bec4-b2a3212f6d9d\/Gif%20-%20rotation.gif\" alt=\"inline image in article\" width=\"783\" height=\"783\" \/><\/picture><\/a><\/div>\n<p style=\"text-align: center;\"><em><span class=\"katex-display\"><span class=\"katex\"><span class=\"katex-mathml\">Example\u00a0of\u00a0a\u00a0complex\u00a0connection\u00a0comprising\u00a0of\u00a017\u00a0members<\/span><span class=\"katex-html\" aria-hidden=\"true\"><span class=\"base\"><span class=\"mord text\"><span class=\"mord sizing reset-size6 size4\"><span class=\"mord textsf textit\">E<\/span><span class=\"mord textsf textit\">x<\/span><span class=\"mord textsf textit\">a<\/span><span class=\"mord textsf textit\">m<\/span><span class=\"mord textsf textit\">p<\/span><span class=\"mord textsf textit\">l<\/span><span class=\"mord textsf textit\">e<\/span><span class=\"mord textsf textit\">o<\/span><span class=\"mord textsf textit\">f<\/span><span class=\"mord textsf textit\">a<\/span><span class=\"mord textsf textit\">c<\/span><span class=\"mord textsf textit\">o<\/span><span class=\"mord textsf textit\">m<\/span><span class=\"mord textsf textit\">p<\/span><span class=\"mord textsf textit\">l<\/span><span class=\"mord textsf textit\">e<\/span><span class=\"mord textsf textit\">x<\/span><span class=\"mord textsf textit\">c<\/span><span class=\"mord textsf textit\">o<\/span><span class=\"mord textsf textit\">n<\/span><span class=\"mord textsf textit\">n<\/span><span class=\"mord textsf textit\">e<\/span><span class=\"mord textsf textit\">c<\/span><span class=\"mord textsf textit\">t<\/span><span class=\"mord textsf textit\">i<\/span><span class=\"mord textsf textit\">o<\/span><span class=\"mord textsf textit\">n<\/span><span class=\"mord textsf textit\">c<\/span><span class=\"mord textsf textit\">o<\/span><span class=\"mord textsf textit\">m<\/span><span class=\"mord textsf textit\">p<\/span><span class=\"mord textsf textit\">r<\/span><span class=\"mord textsf textit\">i<\/span><span class=\"mord textsf textit\">s<\/span><span class=\"mord textsf textit\">i<\/span><span class=\"mord textsf textit\">n<\/span><span class=\"mord textsf textit\">g<\/span><span class=\"mord textsf textit\">o<\/span><span class=\"mord textsf textit\">f<\/span><span class=\"mord textsf textit\">1<\/span><span class=\"mord textsf textit\">7<\/span><span class=\"mord textsf textit\">m<\/span><span class=\"mord textsf textit\">e<\/span><span class=\"mord textsf textit\">m<\/span><span class=\"mord textsf textit\">b<\/span><span class=\"mord textsf textit\">e<\/span><span class=\"mord textsf textit\">r<\/span><span class=\"mord textsf textit\">s<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/em><\/p>\n<h2>Solutions and results<\/h2>\n<p>The initial draft of the truss systems was conducted in Tekla, with all members designed as\u00a0circular hollow section (CHS) members. All joints were engineered as welded to ensure a pure and united structure to avoid any visible connections. Due to minimum thickness, a code-check of stresses on the walls was essential for verification. Engineers from Eversendai\u00a0decided to use the application\u00a0IDEA StatiCa Connection\u00a0to understand the behavior of the joints, optimize them, and verify many combinations simultaneously.<\/p>\n<div><a href=\"https:\/\/assets-us-01.kc-usercontent.com\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/eb1b3283-7170-4d78-b452-e8eae7921a80\/Connection2.png\" data-fancybox=\"inline-image\"><picture><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/eb1b3283-7170-4d78-b452-e8eae7921a80\/Connection2.png\" media=\"(min-width:768px)\" \/><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/eb1b3283-7170-4d78-b452-e8eae7921a80\/Connection2.png?w=768\" media=\"(min-width:650px)\" \/><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/eb1b3283-7170-4d78-b452-e8eae7921a80\/Connection2.png?w=650\" media=\"(min-width:465px)\" \/><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/eb1b3283-7170-4d78-b452-e8eae7921a80\/Connection2.png?w=465\" media=\"(max-width:464px)\" \/><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter\" src=\"https:\/\/assets-us-01.kc-usercontent.com\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/eb1b3283-7170-4d78-b452-e8eae7921a80\/Connection2.png\" alt=\"inline image in article\" width=\"954\" height=\"501\" \/><\/picture><\/a><\/div>\n<p>Moreover, the software helped them to perform\u00a0<a href=\"https:\/\/www.ideastatica.com\/blog\/geometrically-and-materially-nonlinear-analysis-gmna\" data-item-id=\"3f8feb63-23c1-5cd0-bc87-9352cb608c5e\">geometrically nonlinear analysis<\/a>\u00a0(GMNA) and analyze local deformations of hollow cross-section members\u00a0knowing that extremally slender walls with point loads can be negatively influenced by local deformations which impact the overall stability of members.<\/p>\n<div><a href=\"https:\/\/assets-us-01.kc-usercontent.com\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/af5b137b-c992-4bc3-8421-5972ccc4e985\/Connection1.png\" data-fancybox=\"inline-image\"><picture><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/af5b137b-c992-4bc3-8421-5972ccc4e985\/Connection1.png\" media=\"(min-width:768px)\" \/><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/af5b137b-c992-4bc3-8421-5972ccc4e985\/Connection1.png?w=768\" media=\"(min-width:650px)\" \/><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/af5b137b-c992-4bc3-8421-5972ccc4e985\/Connection1.png?w=650\" media=\"(min-width:465px)\" \/><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/af5b137b-c992-4bc3-8421-5972ccc4e985\/Connection1.png?w=465\" media=\"(max-width:464px)\" \/><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter\" src=\"https:\/\/assets-us-01.kc-usercontent.com\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/af5b137b-c992-4bc3-8421-5972ccc4e985\/Connection1.png\" alt=\"inline image in article\" width=\"937\" height=\"492\" \/><\/picture><\/a><\/div>\n<p>During the design, engineers had to find a solution that passes through all relevant checks and consumes a minimum of steel, but also a solution that is quick and easy to fabricate. Usually, for such connections, engineers tend to\u00a0design inside stiffeners, ring stiffeners, or gusset plates, which was not possible in this case. For this time-sensitive project, they had to cut down these operations to a minimum to help the fabrication team to deliver the structure on time.<\/p>\n<p>&nbsp;<\/p>\n<div class=\"\">\n<div class=\"pux-container\">\n<div class=\"small-container\">\n<div class=\"gallery-container lines gallery-perex\" data-slides=\"3\">\n<div class=\"gallery-box\">\n<div class=\"gallery-item-image\"><picture><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/8eaad09d-666c-403e-b762-144711d61269\/Connection.png?w=400\" \/><img decoding=\"async\" src=\"https:\/\/assets-us-01.kc-usercontent.com\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/8eaad09d-666c-403e-b762-144711d61269\/Connection.png?w=400\" alt=\"gallery item image\" \/><\/picture><\/div>\n<\/div>\n<div class=\"gallery-box\">\n<div class=\"gallery-item-image\"><picture><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/7cd09fcd-ec23-4dbc-bef7-6b3ff571f9bf\/Manufacturing1.png?w=400\" \/><img decoding=\"async\" src=\"https:\/\/assets-us-01.kc-usercontent.com\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/7cd09fcd-ec23-4dbc-bef7-6b3ff571f9bf\/Manufacturing1.png?w=400\" alt=\"gallery item image\" \/><\/picture><\/div>\n<\/div>\n<div class=\"gallery-box\">\n<div class=\"gallery-item-image\"><picture><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/5c9928f6-a888-401a-9b63-a76c3e612a45\/Manufacturing.png?w=400\" \/><img decoding=\"async\" src=\"https:\/\/assets-us-01.kc-usercontent.com\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/5c9928f6-a888-401a-9b63-a76c3e612a45\/Manufacturing.png?w=400\" alt=\"gallery item image\" \/><\/picture><\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<p>&nbsp;<\/p>\n<p>The structural engineers were in constant contact with the fabrication team to ensure their design was optimized also for rapid assembly. To expedite the construction process, they deviated from the typical practice of transporting 3-meter sections. Instead, they preassembled larger up to 5.5-meter parts in the construction hall, which were then delivered to the site, significantly reducing on-site assembly time and downsizing the overall project timeline.<\/p>\n<div class=\"small-container\">\n<div class=\"testimonial-item single-testimonial\">\n<div class=\"testimonial-item-text\"><strong>&#8221;We had to design each individual node due to the specific shape of the structure, with around 18 pipe members connecting at a single node joint in multiple directions. Meeting the 1-month deadline would not have been possible without IDEA StatiCa.&#8221;- Vijayabharathi Renganathan Structural Engineer \u2013 Eversendai Engineering United Arab Emirates<\/strong><\/div>\n<\/div>\n<\/div>\n<h2>About Eversendai<\/h2>\n<p>Eversendai Engineering Offices in India, UAE, and Qatar provide comprehensive technical and end-to-end design services, from conceptual design to detailed design including engineering for various types of structures by highly qualified and experienced design engineers and detailers. Thanks to direct contact with the erection steel engineering department, the collaboration can minimize misunderstandings and discrepancies. Structural engineers can incorporate real-world constraints and feedback from the erection team, leading to designs that are not only theoretically sound but also feasible and safe during the erection process. This leads to projects that are more practical to implement, avoiding delays and costly changes. Fabrication of the Opportunity Pavilion in four months is a great example of their 40 years of experience.<\/p>\n<p>So, The Opportunity Pavilion stands as an impressive example of modern engineering, balancing architectural ambition with practical challenges. Despite tight timelines, the use of advanced tools like IDEA StatiCa enabled efficient designing and code-checking of complex nodes. Cooperation between structural engineers and the prefabrication team enabled them to find a way to deliver the project on time. The project&#8217;s completion showcased not only the technical capabilities of Eversendai Engineering but also their ability to deliver under demanding conditions.<\/p>\n<\/div>\n<p>Article From: <a href=\"https:\/\/www.ideastatica.com\/\">www.IDEAstatiCa.com<\/a><\/p>\n<div class=\"article-content-main math-container\">\n<div class=\"text-center mt-50 mb-50\"><\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The Opportunity Pavilion stands as a testament to cutting-edge engineering and rapid construction, located at &hellip;<\/p>\n","protected":false},"author":11,"featured_media":20976,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[1],"tags":[],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v19.6.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Steel canopy structure of Opportunity Pavilion - bimsolutions.ge<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/bimsolutions.ge\/eng\/blog\/steel-canopy-structure-of-opportunity-pavilion\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Steel canopy structure of Opportunity Pavilion - bimsolutions.ge\" \/>\n<meta property=\"og:description\" content=\"The Opportunity Pavilion stands as a testament to cutting-edge engineering and rapid construction, located at &hellip;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/bimsolutions.ge\/eng\/blog\/steel-canopy-structure-of-opportunity-pavilion\/\" \/>\n<meta property=\"og:site_name\" content=\"bimsolutions.ge\" \/>\n<meta property=\"article:published_time\" content=\"2025-03-06T11:53:08+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-03-06T11:53:45+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/bimsolutions.ge\/eng\/wp-content\/uploads\/2025\/03\/Opportunity-Pavilion_night.png\" \/>\n\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t<meta property=\"og:image:height\" content=\"420\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"BIM\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"BIM\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/bimsolutions.ge\/eng\/blog\/steel-canopy-structure-of-opportunity-pavilion\/\",\"url\":\"https:\/\/bimsolutions.ge\/eng\/blog\/steel-canopy-structure-of-opportunity-pavilion\/\",\"name\":\"Steel canopy structure of Opportunity Pavilion - bimsolutions.ge\",\"isPartOf\":{\"@id\":\"https:\/\/bimsolutions.ge\/eng\/#website\"},\"datePublished\":\"2025-03-06T11:53:08+00:00\",\"dateModified\":\"2025-03-06T11:53:45+00:00\",\"author\":{\"@id\":\"https:\/\/bimsolutions.ge\/eng\/#\/schema\/person\/d1833f8d3bcdddc9bcfde04211600b91\"},\"breadcrumb\":{\"@id\":\"https:\/\/bimsolutions.ge\/eng\/blog\/steel-canopy-structure-of-opportunity-pavilion\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/bimsolutions.ge\/eng\/blog\/steel-canopy-structure-of-opportunity-pavilion\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/bimsolutions.ge\/eng\/blog\/steel-canopy-structure-of-opportunity-pavilion\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Steel canopy structure of Opportunity Pavilion\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/bimsolutions.ge\/eng\/#website\",\"url\":\"https:\/\/bimsolutions.ge\/eng\/\",\"name\":\"bimsolutions.ge\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/bimsolutions.ge\/eng\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/bimsolutions.ge\/eng\/#\/schema\/person\/d1833f8d3bcdddc9bcfde04211600b91\",\"name\":\"BIM\",\"sameAs\":[\"https:\/\/bimsolutions.ge\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Steel canopy structure of Opportunity Pavilion - bimsolutions.ge","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/bimsolutions.ge\/eng\/blog\/steel-canopy-structure-of-opportunity-pavilion\/","og_locale":"en_US","og_type":"article","og_title":"Steel canopy structure of Opportunity Pavilion - bimsolutions.ge","og_description":"The Opportunity Pavilion stands as a testament to cutting-edge engineering and rapid construction, located at &hellip;","og_url":"https:\/\/bimsolutions.ge\/eng\/blog\/steel-canopy-structure-of-opportunity-pavilion\/","og_site_name":"bimsolutions.ge","article_published_time":"2025-03-06T11:53:08+00:00","article_modified_time":"2025-03-06T11:53:45+00:00","og_image":[{"width":800,"height":420,"url":"https:\/\/bimsolutions.ge\/eng\/wp-content\/uploads\/2025\/03\/Opportunity-Pavilion_night.png","type":"image\/png"}],"author":"BIM","twitter_card":"summary_large_image","twitter_misc":{"Written by":"BIM","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/bimsolutions.ge\/eng\/blog\/steel-canopy-structure-of-opportunity-pavilion\/","url":"https:\/\/bimsolutions.ge\/eng\/blog\/steel-canopy-structure-of-opportunity-pavilion\/","name":"Steel canopy structure of Opportunity Pavilion - bimsolutions.ge","isPartOf":{"@id":"https:\/\/bimsolutions.ge\/eng\/#website"},"datePublished":"2025-03-06T11:53:08+00:00","dateModified":"2025-03-06T11:53:45+00:00","author":{"@id":"https:\/\/bimsolutions.ge\/eng\/#\/schema\/person\/d1833f8d3bcdddc9bcfde04211600b91"},"breadcrumb":{"@id":"https:\/\/bimsolutions.ge\/eng\/blog\/steel-canopy-structure-of-opportunity-pavilion\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/bimsolutions.ge\/eng\/blog\/steel-canopy-structure-of-opportunity-pavilion\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/bimsolutions.ge\/eng\/blog\/steel-canopy-structure-of-opportunity-pavilion\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Steel canopy structure of Opportunity Pavilion"}]},{"@type":"WebSite","@id":"https:\/\/bimsolutions.ge\/eng\/#website","url":"https:\/\/bimsolutions.ge\/eng\/","name":"bimsolutions.ge","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/bimsolutions.ge\/eng\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/bimsolutions.ge\/eng\/#\/schema\/person\/d1833f8d3bcdddc9bcfde04211600b91","name":"BIM","sameAs":["https:\/\/bimsolutions.ge"]}]}},"_links":{"self":[{"href":"https:\/\/bimsolutions.ge\/eng\/wp-json\/wp\/v2\/posts\/20975"}],"collection":[{"href":"https:\/\/bimsolutions.ge\/eng\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bimsolutions.ge\/eng\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bimsolutions.ge\/eng\/wp-json\/wp\/v2\/users\/11"}],"replies":[{"embeddable":true,"href":"https:\/\/bimsolutions.ge\/eng\/wp-json\/wp\/v2\/comments?post=20975"}],"version-history":[{"count":2,"href":"https:\/\/bimsolutions.ge\/eng\/wp-json\/wp\/v2\/posts\/20975\/revisions"}],"predecessor-version":[{"id":20978,"href":"https:\/\/bimsolutions.ge\/eng\/wp-json\/wp\/v2\/posts\/20975\/revisions\/20978"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/bimsolutions.ge\/eng\/wp-json\/wp\/v2\/media\/20976"}],"wp:attachment":[{"href":"https:\/\/bimsolutions.ge\/eng\/wp-json\/wp\/v2\/media?parent=20975"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bimsolutions.ge\/eng\/wp-json\/wp\/v2\/categories?post=20975"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bimsolutions.ge\/eng\/wp-json\/wp\/v2\/tags?post=20975"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}