{"id":21504,"date":"2026-02-03T10:36:01","date_gmt":"2026-02-03T07:36:01","guid":{"rendered":"https:\/\/bimsolutions.ge\/eng\/?p=21504"},"modified":"2026-02-03T10:38:29","modified_gmt":"2026-02-03T07:38:29","slug":"removing-critical-blockers-in-anchoring-and-connections-for-air-arabia-hangar","status":"publish","type":"post","link":"https:\/\/bimsolutions.ge\/eng\/blog\/removing-critical-blockers-in-anchoring-and-connections-for-air-arabia-hangar\/","title":{"rendered":"Removing critical blockers in anchoring and connections for Air Arabia Hangar"},"content":{"rendered":"<div class=\"article-content-perex perex mb-30\">The Air Arabia Hangar is a large-span steel truss structure which posed significant challenges due to the need for pin connections with non-standard parameters and steel joints with as many as 13 members.<\/div>\n<div class=\"small-container\">\n<div class=\"testimonial-item single-testimonial\">\n<div><\/div>\n<div class=\"testimonial-item-text\">&#8221;IDEA StatiCa enabled us to fulfill consultant&#8217;s requirements for high complexity details and pin connections, which was needed for the project to progress.&#8221;-<\/div>\n<div class=\"testimonial-item-person\">\n<div class=\"testimonial-item-person-name\">Dr. Seham Ahmed El Saeed, Product Technical Senior Manager ,Kirby Building Systems United Arab Emirates<\/div>\n<\/div>\n<\/div>\n<\/div>\n<h2>The challenge<\/h2>\n<p><img decoding=\"async\" loading=\"lazy\" class=\" wp-image-21506 aligncenter\" src=\"https:\/\/bimsolutions.ge\/eng\/wp-content\/uploads\/2026\/02\/WhatsApp-Image-2025-07-04-at-8.12.08-AM.jpeg\" alt=\"\" width=\"766\" height=\"431\" srcset=\"https:\/\/bimsolutions.ge\/eng\/wp-content\/uploads\/2026\/02\/WhatsApp-Image-2025-07-04-at-8.12.08-AM.jpeg 800w, https:\/\/bimsolutions.ge\/eng\/wp-content\/uploads\/2026\/02\/WhatsApp-Image-2025-07-04-at-8.12.08-AM-300x169.jpeg 300w, https:\/\/bimsolutions.ge\/eng\/wp-content\/uploads\/2026\/02\/WhatsApp-Image-2025-07-04-at-8.12.08-AM-360x202.jpeg 360w, https:\/\/bimsolutions.ge\/eng\/wp-content\/uploads\/2026\/02\/WhatsApp-Image-2025-07-04-at-8.12.08-AM-555x312.jpeg 555w, https:\/\/bimsolutions.ge\/eng\/wp-content\/uploads\/2026\/02\/WhatsApp-Image-2025-07-04-at-8.12.08-AM-600x338.jpeg 600w\" sizes=\"(max-width: 766px) 100vw, 766px\" \/><br \/>\nThe project required a\u00a0<strong>pinned connection for the base detail to form a perfect hinge<\/strong>. The connection is formed by a central steel rod (the pin) with its axis perpendicular to the applied loads and several plates with circular holes through which the pin is inserted.Designing such complex details required a finite analysis supported by standard code equations. The consultant has restricted the connection design by requiring the use of a connection software that is able to define all the parameters and tolerance for pin holes after fabrication. \u201cIDEA Statica software enabled us to do this,\u201d states Dr. Seham.Moreover, the project required\u00a0<strong>verifying a node where 13 members converged\u00a0<\/strong>into a single joint at irregular angles. Apart from many complex connections, solving\u00a0<strong>150+ similar connections and transferring data among teams<\/strong>\u00a0would take a lot of time if only standard tools were used.Fortunately, thanks to their experience and professionalism, Kirby&#8217;s team found solutions for all of the project&#8217;s challenges.<\/p>\n<h2>About the Project<\/h2>\n<p>The Air Arabia Hangar is a large-span steel truss structure designed for aircraft maintenance operations at Sharjah International Airport. The hangar\u2019s external dimensions are 136 m wide \u00d7 57 m deep, with a minimum clear span of 129.5 m and a crane hook height of 15 m. It accommodates three overhead cranes (6T capacity), mezzanines, skylights, fall arrest systems, and specialized hangar doors.<\/p>\n<div class=\"grid-gallery\">\n<div class=\"pux-container\">\n<div class=\"small-container\">\n<div class=\"gallery-container \">\n<div class=\"gallery-box\" data-more=\"-1\">\n<div class=\"gallery-item-image\"><picture><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/d4ccaa4b-e5b1-4191-8ffa-ba0cf23b0e9b\/Picture1_1.png?w=768\" media=\"(min-width:650px)\" \/><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/d4ccaa4b-e5b1-4191-8ffa-ba0cf23b0e9b\/Picture1_1.png?w=650\" media=\"(min-width:465px)\" \/><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/d4ccaa4b-e5b1-4191-8ffa-ba0cf23b0e9b\/Picture1_1.png?w=465\" media=\"(max-width:464px)\" \/><img decoding=\"async\" loading=\"lazy\" class=\"\" src=\"https:\/\/assets-us-01.kc-usercontent.com\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/d4ccaa4b-e5b1-4191-8ffa-ba0cf23b0e9b\/Picture1_1.png\" alt=\"gallery item image\" width=\"447\" height=\"447\" \/><\/picture><\/div>\n<\/div>\n<div class=\"gallery-box\" data-more=\"-1\">\n<div class=\"gallery-item-image\"><picture><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/36b59edc-6482-4197-bffc-c718d6c33f09\/Picture1_2.png?w=768\" media=\"(min-width:650px)\" \/><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/36b59edc-6482-4197-bffc-c718d6c33f09\/Picture1_2.png?w=650\" media=\"(min-width:465px)\" \/><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/36b59edc-6482-4197-bffc-c718d6c33f09\/Picture1_2.png?w=465\" media=\"(max-width:464px)\" \/><img decoding=\"async\" loading=\"lazy\" class=\"\" src=\"https:\/\/assets-us-01.kc-usercontent.com\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/36b59edc-6482-4197-bffc-c718d6c33f09\/Picture1_2.png\" alt=\"gallery item image\" width=\"322\" height=\"161\" \/><\/picture><\/div>\n<\/div>\n<div class=\"gallery-box\" data-more=\"-1\">\n<div class=\"gallery-item-image\"><picture><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/1acb811c-8977-48b5-a8ff-8f70e2dd6e46\/Picture1_3.png?w=768\" media=\"(min-width:650px)\" \/><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/1acb811c-8977-48b5-a8ff-8f70e2dd6e46\/Picture1_3.png?w=650\" media=\"(min-width:465px)\" \/><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/1acb811c-8977-48b5-a8ff-8f70e2dd6e46\/Picture1_3.png?w=465\" media=\"(max-width:464px)\" \/><img decoding=\"async\" src=\"https:\/\/assets-us-01.kc-usercontent.com\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/1acb811c-8977-48b5-a8ff-8f70e2dd6e46\/Picture1_3.png\" alt=\"gallery item image\" \/><\/picture><\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<p>Protection of steel was ensured using shop primer compatible with intumescent fireproofing. Kirby\u2019s scope included the design and supply of the steel structure, preparation of design drawings and calculations, consultant approval, shop and fabrication drawings, fabrication and supply of pre-engineered sections, and provision of erection methodology.<\/p>\n<h2>Solving a pinned base connection \u2013 a challenge to the job\u2019s progress<\/h2>\n<div><a href=\"https:\/\/assets-us-01.kc-usercontent.com\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/b88d3294-2385-42b4-8c95-02013581ba47\/pinconnection1.png\" data-fancybox=\"inline-image\"><picture><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/b88d3294-2385-42b4-8c95-02013581ba47\/pinconnection1.png\" media=\"(min-width:768px)\" \/><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/b88d3294-2385-42b4-8c95-02013581ba47\/pinconnection1.png?w=768\" media=\"(min-width:650px)\" \/><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/b88d3294-2385-42b4-8c95-02013581ba47\/pinconnection1.png?w=650\" media=\"(min-width:465px)\" \/><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/b88d3294-2385-42b4-8c95-02013581ba47\/pinconnection1.png?w=465\" media=\"(max-width:464px)\" \/><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter\" src=\"https:\/\/assets-us-01.kc-usercontent.com\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/b88d3294-2385-42b4-8c95-02013581ba47\/pinconnection1.png\" alt=\"inline image in article\" width=\"606\" height=\"472\" \/><\/picture><\/a><\/div>\n<p>The consultant required a pinned base connection detail that was rarely used in practice. The challenge escalated when they required a connection software that could perform this type of detail.<\/p>\n<div class=\"small-container\">\n<div class=\"testimonial-item single-testimonial\">\n<div class=\"testimonial-item-text\">&#8221;Thanks to IDEA StatiCa, we could perform this type of design. Also, after fabrication stage, IDEA StatiCa was a great tool to verify the impact of tolerances on those types of connections.&#8221; &#8211; Dr. Seham Ahmed El Saeed<\/div>\n<\/div>\n<\/div>\n<p>Fortunately, Kirby\u2019s team prepared for this situation. Using IDEA StatiCa\u2019s component-based finite element method (CBFEM), they designed the pinned base connection with the actual fabricated conditions. The software evaluated the stress distribution and interaction under realistic loading, demonstrating that the connection remained safe and within acceptable performance limits.<\/p>\n<div><a href=\"https:\/\/assets-us-01.kc-usercontent.com\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/f0c1217c-c1bc-4211-8882-5572588fec6f\/pinconnection2.png\" data-fancybox=\"inline-image\"><picture><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/f0c1217c-c1bc-4211-8882-5572588fec6f\/pinconnection2.png\" media=\"(min-width:768px)\" \/><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/f0c1217c-c1bc-4211-8882-5572588fec6f\/pinconnection2.png?w=768\" media=\"(min-width:650px)\" \/><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/f0c1217c-c1bc-4211-8882-5572588fec6f\/pinconnection2.png?w=650\" media=\"(min-width:465px)\" \/><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/f0c1217c-c1bc-4211-8882-5572588fec6f\/pinconnection2.png?w=465\" media=\"(max-width:464px)\" \/><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter\" src=\"https:\/\/assets-us-01.kc-usercontent.com\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/f0c1217c-c1bc-4211-8882-5572588fec6f\/pinconnection2.png\" alt=\"inline image in article\" width=\"601\" height=\"468\" \/><\/picture><\/a><\/div>\n<p>The validated outputs, supported by third-party verification, gave the consultant confidence to approve the connection.<\/p>\n<h2>How 13-member joints stopped being a challenge<\/h2>\n<p>One of the most demanding tasks in the hangar project was verifying a node where 13 members converged into a single joint at irregular angles. This was exceptionally challenging because it required consideration of axial, shear, and bending interactions simultaneously in a highly unsymmetrical 3D geometry. Manually rebuilding the geometry and calculating stress interactions branch by branch would have been excessively time-consuming and prone to error.<\/p>\n<div class=\"grid-gallery\">\n<div class=\"pux-container\">\n<div class=\"small-container\">\n<div class=\"gallery-container \">\n<div class=\"gallery-box\" data-more=\"-1\">\n<div class=\"gallery-item-image\"><picture><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/57f8e3c0-ba3e-48bc-9b38-832d16ff637d\/connection_1.png?w=768\" media=\"(min-width:650px)\" \/><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/57f8e3c0-ba3e-48bc-9b38-832d16ff637d\/connection_1.png?w=650\" media=\"(min-width:465px)\" \/><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/57f8e3c0-ba3e-48bc-9b38-832d16ff637d\/connection_1.png?w=465\" media=\"(max-width:464px)\" \/><img decoding=\"async\" loading=\"lazy\" class=\"alignleft\" src=\"https:\/\/assets-us-01.kc-usercontent.com\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/57f8e3c0-ba3e-48bc-9b38-832d16ff637d\/connection_1.png\" alt=\"gallery item image\" width=\"561\" height=\"561\" \/><\/picture><\/div>\n<\/div>\n<div class=\"gallery-box\" data-more=\"-1\">\n<div class=\"gallery-item-image\"><picture><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/feef65af-39e9-4f4c-9ee5-afdf2ce6ed50\/connection_2.png?w=768\" media=\"(min-width:650px)\" \/><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/feef65af-39e9-4f4c-9ee5-afdf2ce6ed50\/connection_2.png?w=650\" media=\"(min-width:465px)\" \/><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/feef65af-39e9-4f4c-9ee5-afdf2ce6ed50\/connection_2.png?w=465\" media=\"(max-width:464px)\" \/><img decoding=\"async\" loading=\"lazy\" class=\"\" src=\"https:\/\/assets-us-01.kc-usercontent.com\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/feef65af-39e9-4f4c-9ee5-afdf2ce6ed50\/connection_2.png\" alt=\"gallery item image\" width=\"552\" height=\"276\" \/><\/picture><\/div>\n<\/div>\n<div class=\"gallery-box\" data-more=\"-1\">\n<div class=\"gallery-item-image\"><picture><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/ef32b592-fd0e-49a7-9941-94766968bb8a\/connection_3.png?w=768\" media=\"(min-width:650px)\" \/><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/ef32b592-fd0e-49a7-9941-94766968bb8a\/connection_3.png?w=650\" media=\"(min-width:465px)\" \/><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/ef32b592-fd0e-49a7-9941-94766968bb8a\/connection_3.png?w=465\" media=\"(max-width:464px)\" \/><img decoding=\"async\" loading=\"lazy\" class=\"\" src=\"https:\/\/assets-us-01.kc-usercontent.com\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/ef32b592-fd0e-49a7-9941-94766968bb8a\/connection_3.png\" alt=\"gallery item image\" width=\"306\" height=\"306\" \/><\/picture><\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"small-container\">\n<div class=\"testimonial-item single-testimonial\">&#8221;At one critical joint, 13 members converged into a single node, many with different angles. Each truss had different loads and requirements. Using IDEA StatiCa we were able to design it in a matter of hours&#8221;. &#8211; Dr. Seham Ahmed El Saeed<\/div>\n<\/div>\n<p>Kirby\u2019s team did stand up to the challenge and managed to overcome it with flying colours. Using BIM Links through IDEA StatiCa\u2019s app Checkbot, Kirby integrated IDEA StatiCa directly with STAAD.Pro. The joint topology, cross-sections, inclinations, and multi-plane rotations, along with all the load cases, were automatically extracted and transferred into IDEA StatiCa. This eliminated the need for manual reconstruction and provided an immediate, validated starting point.<\/p>\n<p>\u201cIt was very important that we could export the data from STAAD.pro directly to IDEA StatiCa Checkbot, which significantly reduced the risk of error,\u201d states Dr. Seham.<\/p>\n<p>Instead of envelope load cases, the team analysed directly corresponding load effects, resulting in a more economical design. IDEA StatiCa captured the full stress interactions across the node and verified the connection with comprehensive code-based checks, completing in hours what would have otherwise required extensive engineering effort.<\/p>\n<div><a href=\"https:\/\/assets-us-01.kc-usercontent.com\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/5c910d63-2051-4ed6-bd2f-9bdcf98423eb\/connections5.png\" data-fancybox=\"inline-image\"><picture><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/5c910d63-2051-4ed6-bd2f-9bdcf98423eb\/connections5.png\" media=\"(min-width:768px)\" \/><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/5c910d63-2051-4ed6-bd2f-9bdcf98423eb\/connections5.png?w=768\" media=\"(min-width:650px)\" \/><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/5c910d63-2051-4ed6-bd2f-9bdcf98423eb\/connections5.png?w=650\" media=\"(min-width:465px)\" \/><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/5c910d63-2051-4ed6-bd2f-9bdcf98423eb\/connections5.png?w=465\" media=\"(max-width:464px)\" \/><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter\" src=\"https:\/\/assets-us-01.kc-usercontent.com\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/5c910d63-2051-4ed6-bd2f-9bdcf98423eb\/connections5.png\" alt=\"inline image in article\" width=\"529\" height=\"412\" \/><\/picture><\/a><\/div>\n<div class=\"small-container\">\n<div class=\"testimonial-item single-testimonial\">\n<div class=\"testimonial-item-text\">&#8221;In general, transferring the data including the loads accurately normally takes 3 days. With IDEA StatiCa, it takes 5 minutes.&#8221; &#8211; Dr. Seham Ahmed El Saeed<\/div>\n<\/div>\n<\/div>\n<h2>Saving 20% of repetitive work with each of +150 similar connections<\/h2>\n<p>Slight geometric variations across the hangar meant that many nodes were similar but not identical. Engineers would have to re-model and re-check each connection separately, which would be repetitive, time-consuming, and risking inconsistency.<\/p>\n<div><a href=\"https:\/\/assets-us-01.kc-usercontent.com\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/a8c1765b-2ec3-4765-9016-bb833f158ff4\/WhatsApp%20Image%202025-06-10%20at%209.18.28%20PM.jpeg\" data-fancybox=\"inline-image\"><picture><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/a8c1765b-2ec3-4765-9016-bb833f158ff4\/WhatsApp%20Image%202025-06-10%20at%209.18.28%20PM.jpeg\" media=\"(min-width:768px)\" \/><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/a8c1765b-2ec3-4765-9016-bb833f158ff4\/WhatsApp%20Image%202025-06-10%20at%209.18.28%20PM.jpeg?w=768\" media=\"(min-width:650px)\" \/><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/a8c1765b-2ec3-4765-9016-bb833f158ff4\/WhatsApp%20Image%202025-06-10%20at%209.18.28%20PM.jpeg?w=650\" media=\"(min-width:465px)\" \/><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/a8c1765b-2ec3-4765-9016-bb833f158ff4\/WhatsApp%20Image%202025-06-10%20at%209.18.28%20PM.jpeg?w=465\" media=\"(max-width:464px)\" \/><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter\" src=\"https:\/\/assets-us-01.kc-usercontent.com\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/a8c1765b-2ec3-4765-9016-bb833f158ff4\/WhatsApp%20Image%202025-06-10%20at%209.18.28%20PM.jpeg\" alt=\"inline image in article\" width=\"673\" height=\"303\" \/><\/picture><\/a><\/div>\n<p>Kirby found a way to trim the process considerably so that they could focus on the challenging work where their skill matters the most. They used the Propose &amp; Publish functionality, modelling a connection once in IDEA StatiCa and publishing it to their internal template library, to be reused wherever a similar node occurs.By simply proposing the saved template into the new location, they avoided starting from scratch. This significantly reduced engineering time and ensured uniform quality across all grid lines.<\/p>\n<div><a href=\"https:\/\/assets-us-01.kc-usercontent.com\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/9c479b9d-e59d-4385-8bab-99729549bd0a\/templates.png\" data-fancybox=\"inline-image\"><picture><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/9c479b9d-e59d-4385-8bab-99729549bd0a\/templates.png\" media=\"(min-width:768px)\" \/><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/9c479b9d-e59d-4385-8bab-99729549bd0a\/templates.png?w=768\" media=\"(min-width:650px)\" \/><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/9c479b9d-e59d-4385-8bab-99729549bd0a\/templates.png?w=650\" media=\"(min-width:465px)\" \/><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/9c479b9d-e59d-4385-8bab-99729549bd0a\/templates.png?w=465\" media=\"(max-width:464px)\" \/><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter\" src=\"https:\/\/assets-us-01.kc-usercontent.com\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/9c479b9d-e59d-4385-8bab-99729549bd0a\/templates.png\" alt=\"inline image in article\" width=\"607\" height=\"287\" \/><\/picture><\/a><\/div>\n<div class=\"small-container\">\n<div class=\"testimonial-item single-testimonial\">\n<div class=\"testimonial-item-text\">&#8221;We created our own templates, which saved us roughly 20% per each of the 150 geometrically similar connections.&#8221; &#8211; Dr. Seham Ahmed El Saeed<\/div>\n<div class=\"testimonial-item-person\">\n<div class=\"testimonial-item-person-name\">\n<div class=\"testimonial-item-person-company\"><\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<h2>Cutting down the time to share connection designs with the detailing team<\/h2>\n<p>Conventionally, engineers would prepare detailed sketches for each connection and send them to the detailing team, leading to long cycles of back-and-forth validation and a high risk of misinterpretation when moving designs into Tekla.As usual, Kirby\u2019s engineers found a way to solve this issue: they shared direct IDEA StatiCa Viewer links with their detailing team. This allowed detailers to open the connection models online, inspect every plate, weld, and bolt, and then directly model the details in Tekla. This eliminated the need for sketch preparation, reduced review loops, and streamlined communication between engineering and detailing teams.<\/p>\n<div><a href=\"https:\/\/assets-us-01.kc-usercontent.com\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/4807732c-99c0-45b1-8f37-d63dbd28de15\/viewer.png\" data-fancybox=\"inline-image\"><picture><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/4807732c-99c0-45b1-8f37-d63dbd28de15\/viewer.png\" media=\"(min-width:768px)\" \/><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/4807732c-99c0-45b1-8f37-d63dbd28de15\/viewer.png?w=768\" media=\"(min-width:650px)\" \/><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/4807732c-99c0-45b1-8f37-d63dbd28de15\/viewer.png?w=650\" media=\"(min-width:465px)\" \/><source srcset=\"https:\/\/assets-us-01.kc-usercontent.com:443\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/4807732c-99c0-45b1-8f37-d63dbd28de15\/viewer.png?w=465\" media=\"(max-width:464px)\" \/><img decoding=\"async\" class=\"aligncenter\" src=\"https:\/\/assets-us-01.kc-usercontent.com\/1ca05609-4ad1-009e-bc40-2e1230b16a75\/4807732c-99c0-45b1-8f37-d63dbd28de15\/viewer.png\" alt=\"inline image in article\" \/><\/picture><\/a><\/div>\n<div class=\"small-container\">\n<div class=\"testimonial-item single-testimonial\">\n<div class=\"testimonial-item-text\">&#8221;Before IDEA StatiCa, designers would prepare 2D sketches for approval before passing them to our detailing team. Now we receive the 3D model directly, visualize every plate, bolt, and weld, and even open multiple connection files at once. It saved us hours of cross-referencing drawings and made collaboration with design and fabrication teams much smoother.&#8221; &#8211; Shahul Hameed Abdul, Drafting Team Leader \u2013 Kirby Building Systems<\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The Air Arabia Hangar is a large-span steel truss structure which posed significant challenges due &hellip;<\/p>\n","protected":false},"author":11,"featured_media":21505,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[1],"tags":[],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v19.6.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Removing critical blockers in anchoring and connections for Air Arabia Hangar - bimsolutions.ge<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/bimsolutions.ge\/eng\/blog\/removing-critical-blockers-in-anchoring-and-connections-for-air-arabia-hangar\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Removing critical blockers in anchoring and connections for Air Arabia Hangar - bimsolutions.ge\" \/>\n<meta property=\"og:description\" content=\"The Air Arabia Hangar is a large-span steel truss structure which posed significant challenges due &hellip;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/bimsolutions.ge\/eng\/blog\/removing-critical-blockers-in-anchoring-and-connections-for-air-arabia-hangar\/\" \/>\n<meta property=\"og:site_name\" content=\"bimsolutions.ge\" \/>\n<meta property=\"article:published_time\" content=\"2026-02-03T07:36:01+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-02-03T07:38:29+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/bimsolutions.ge\/eng\/wp-content\/uploads\/2026\/02\/1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"940\" \/>\n\t<meta property=\"og:image:height\" content=\"527\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"BIM\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"BIM\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/bimsolutions.ge\/eng\/blog\/removing-critical-blockers-in-anchoring-and-connections-for-air-arabia-hangar\/\",\"url\":\"https:\/\/bimsolutions.ge\/eng\/blog\/removing-critical-blockers-in-anchoring-and-connections-for-air-arabia-hangar\/\",\"name\":\"Removing critical blockers in anchoring and connections for Air Arabia Hangar - bimsolutions.ge\",\"isPartOf\":{\"@id\":\"https:\/\/bimsolutions.ge\/eng\/#website\"},\"datePublished\":\"2026-02-03T07:36:01+00:00\",\"dateModified\":\"2026-02-03T07:38:29+00:00\",\"author\":{\"@id\":\"https:\/\/bimsolutions.ge\/eng\/#\/schema\/person\/d1833f8d3bcdddc9bcfde04211600b91\"},\"breadcrumb\":{\"@id\":\"https:\/\/bimsolutions.ge\/eng\/blog\/removing-critical-blockers-in-anchoring-and-connections-for-air-arabia-hangar\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/bimsolutions.ge\/eng\/blog\/removing-critical-blockers-in-anchoring-and-connections-for-air-arabia-hangar\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/bimsolutions.ge\/eng\/blog\/removing-critical-blockers-in-anchoring-and-connections-for-air-arabia-hangar\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Removing critical blockers in anchoring and connections for Air Arabia Hangar\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/bimsolutions.ge\/eng\/#website\",\"url\":\"https:\/\/bimsolutions.ge\/eng\/\",\"name\":\"bimsolutions.ge\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/bimsolutions.ge\/eng\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/bimsolutions.ge\/eng\/#\/schema\/person\/d1833f8d3bcdddc9bcfde04211600b91\",\"name\":\"BIM\",\"sameAs\":[\"https:\/\/bimsolutions.ge\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Removing critical blockers in anchoring and connections for Air Arabia Hangar - bimsolutions.ge","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/bimsolutions.ge\/eng\/blog\/removing-critical-blockers-in-anchoring-and-connections-for-air-arabia-hangar\/","og_locale":"en_US","og_type":"article","og_title":"Removing critical blockers in anchoring and connections for Air Arabia Hangar - bimsolutions.ge","og_description":"The Air Arabia Hangar is a large-span steel truss structure which posed significant challenges due &hellip;","og_url":"https:\/\/bimsolutions.ge\/eng\/blog\/removing-critical-blockers-in-anchoring-and-connections-for-air-arabia-hangar\/","og_site_name":"bimsolutions.ge","article_published_time":"2026-02-03T07:36:01+00:00","article_modified_time":"2026-02-03T07:38:29+00:00","og_image":[{"width":940,"height":527,"url":"https:\/\/bimsolutions.ge\/eng\/wp-content\/uploads\/2026\/02\/1.png","type":"image\/png"}],"author":"BIM","twitter_card":"summary_large_image","twitter_misc":{"Written by":"BIM","Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/bimsolutions.ge\/eng\/blog\/removing-critical-blockers-in-anchoring-and-connections-for-air-arabia-hangar\/","url":"https:\/\/bimsolutions.ge\/eng\/blog\/removing-critical-blockers-in-anchoring-and-connections-for-air-arabia-hangar\/","name":"Removing critical blockers in anchoring and connections for Air Arabia Hangar - bimsolutions.ge","isPartOf":{"@id":"https:\/\/bimsolutions.ge\/eng\/#website"},"datePublished":"2026-02-03T07:36:01+00:00","dateModified":"2026-02-03T07:38:29+00:00","author":{"@id":"https:\/\/bimsolutions.ge\/eng\/#\/schema\/person\/d1833f8d3bcdddc9bcfde04211600b91"},"breadcrumb":{"@id":"https:\/\/bimsolutions.ge\/eng\/blog\/removing-critical-blockers-in-anchoring-and-connections-for-air-arabia-hangar\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/bimsolutions.ge\/eng\/blog\/removing-critical-blockers-in-anchoring-and-connections-for-air-arabia-hangar\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/bimsolutions.ge\/eng\/blog\/removing-critical-blockers-in-anchoring-and-connections-for-air-arabia-hangar\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Removing critical blockers in anchoring and connections for Air Arabia Hangar"}]},{"@type":"WebSite","@id":"https:\/\/bimsolutions.ge\/eng\/#website","url":"https:\/\/bimsolutions.ge\/eng\/","name":"bimsolutions.ge","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/bimsolutions.ge\/eng\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/bimsolutions.ge\/eng\/#\/schema\/person\/d1833f8d3bcdddc9bcfde04211600b91","name":"BIM","sameAs":["https:\/\/bimsolutions.ge"]}]}},"_links":{"self":[{"href":"https:\/\/bimsolutions.ge\/eng\/wp-json\/wp\/v2\/posts\/21504"}],"collection":[{"href":"https:\/\/bimsolutions.ge\/eng\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bimsolutions.ge\/eng\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bimsolutions.ge\/eng\/wp-json\/wp\/v2\/users\/11"}],"replies":[{"embeddable":true,"href":"https:\/\/bimsolutions.ge\/eng\/wp-json\/wp\/v2\/comments?post=21504"}],"version-history":[{"count":4,"href":"https:\/\/bimsolutions.ge\/eng\/wp-json\/wp\/v2\/posts\/21504\/revisions"}],"predecessor-version":[{"id":21510,"href":"https:\/\/bimsolutions.ge\/eng\/wp-json\/wp\/v2\/posts\/21504\/revisions\/21510"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/bimsolutions.ge\/eng\/wp-json\/wp\/v2\/media\/21505"}],"wp:attachment":[{"href":"https:\/\/bimsolutions.ge\/eng\/wp-json\/wp\/v2\/media?parent=21504"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bimsolutions.ge\/eng\/wp-json\/wp\/v2\/categories?post=21504"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bimsolutions.ge\/eng\/wp-json\/wp\/v2\/tags?post=21504"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}